1 – Full closure on 40th Street East from Avenue R- 12 to Avenue S from October 15 until November 28

There will be a full closure on 40th E with a detour in place. Please obey the traffic control and follow the detours. Expect delays. This is for storm drain pipe extension.

2 - 25th Street East from Palmdale Boulevard to Avenue S

Intermittent lane closures for pavement resurfacing of the interior lanes.

Please obey the traffic control and expect delays

3 - 35th Street East from Avenue S to Desert Oak Drive

Intermittent lane closures for Striping, traffic signal loops and utility adjustments within the pavement overlay section for the next couple of weeks.

4 - Technology Drive from Sierra Highway to 10th Street West

Intermittent lane closures for Striping, traffic signal loops and utility adjustments within the pavement overlay section for the next couple of weeks.

5 - Avenue M from 20th Street East to 50th Street East

Intermittent lane closures for striping, traffic signal loops and utility adjustments within the pavement overlay section for the next couple of weeks.

6- Elizabeth Lake Road from 2500’ east of Ranch Center Drive to 1500’ West of Joshua Ranch Road

Temporary traffic control with reduced speeds along with a temporary three way stop at the Intersection of Elizabeth Lake Road and Ranch Center Drive. This is for the Joshua Ranch Development’s sewer and water improvements.

9 - 10th Street East, 9th Street East, Avenue Q-11 and Avenue Q-12

Intermittent street and lane closures for Courson Arts Colony offsite utility and street improvements. Q-12 closed between 10TH Street East and 11th Street East.

Streetlighting Retrofit Traffic Control Areas

The City recently acquired nearly 18,000 streetlights from Southern California Edison and is in the process of converting them from High Pressure Sodium (HPS) to Light Emitting Diode (LED). The new LED lights are more energy efficient and last up to five times longer than the old HPS. The contractor will be spending no more than ten minutes at each light, and any effect on traffic should be brief.

Streetlight Updates Week of October 29 – November 4

  • Residential streets from Ave. M-8 and Ave. N from 60th St. W. to 50th St. west

  • Residential streets South of Ave. N-8 between Godde Hill Rd. and Bolz Ranch Rd.

  • Residential streets West of 30th St. West

  • Residential streets from Ave. N and Ave O-12 and 50th St. W. to 30th St. W.

  • Residential streets from 10th St. W. to Division St. and Fairway Drive to Rancho Vista Blvd.

  • Rancho Vista Blvd. and Ave P-8 and 30th St. W. to 22nd St. W.

For more information, call the public works department at 267-5300.